- All
- Product Management
- News
- Introduction
- Enterprise outlets
- FAQ
- Enterprise Video
- Enterprise Atlas
Five maintenance rules for fire alarm systems
1. Check the power supply of the fire alarm system to see if it has caused fluctuations when combined with the power supply of large equipment. It is necessary to ensure that the fire alarm system is powered by a separate circuit, and to check the voltage deviation of the fire alarm system. Necessary voltage adjustment measures should be taken. The detailed rules for power supply inspection are to charge and discharge the backup power supply 1-2 times every quarter.
The most important part of a fire alarm system is the alarm device. Users can conduct necessary analysis based on specific performance. When the fire detector receives smoke, the alarm confirmation light will light up, indicating that the detector is working normally. At the same time, it will send a fire signal to the alarm controller. Also check if the clock is running and if there is a record of the time when a fire alarm occurred. After inspection, the on duty personnel should promptly silence and reset the equipment to prevent damage to the equipment components due to prolonged use.
Another point is to strengthen the management of technical data archives for fire alarm systems. This is because preservation is very important and has great reference value for fire protection work and system maintenance, providing managers with a systematic basis to follow.
4. The triggering device in the fire alarm system should also be tested. The detector should not only prevent false alarms caused by external natural factors such as smoke, dust, and similar aerosols, small animals, water vapor condensation, icing, etc., but also prevent human factors such as the placement of bookshelves, storage racks, or the impact of equipment, partitions, etc. on the detector and manual alarm button, and the alarm will malfunction.
5. The last point is that maintenance measures for the linkage control system are important, and it is necessary to ensure its normal operation. Effective inspections of the control center should be carried out, and relevant measures should be taken if necessary.